Absolute Clean Energy Public Company Limited runs electricity and steam generating and distributing business both domestically and internationally.
- Asia Clean Energy Co., Ltd. (ASCE)
A holding company which mainly holds electricity and steam business shares
- Advance Clean Power Co., Ltd. ACP
- Alliance Clean Power Co., Ltd. ALCP
- National Clean Energy Co., Ltd. NCE
- Absolute Power Plant Co., Ltd. ABP
- Advance Agro Power Plant Co., Ltd. AAPP
- Advance Asia Power Plant Co., Ltd. AAP
- Advance Bio Asia Co., Ltd. ABA
- Advance Farm Tree Co., Ltd. AFT
- Bio Power Plant Co., Ltd. BPP
- ACE SOLAR Co., Ltd. ACE SOLAR
- Asia Clean Water Co., Ltd. (Former name: Prasatporn Rungrueng Co., Ltd ACW
- Advance Agro Asia Co., Ltd. AAA
- Advance Asia Energy Co., Ltd. (Former name: UWC Komen Biomass Co., Ltd. (“UKB”)) AAE
- Advance Bio Energy Co., Ltd. (Former name: UWC Amphan Komen Biomass Co., Ltd. ABE
- Absolute Clean Engineering and Service Co., Ltd. (Former name: Satuek Biomass Co., Ltd. (“SBM”)) ACES
- Power Supply and Maintenance Service Co., Ltd. PSMS
- Provincial Renewable Energy (Thailand) Co., Ltd. PRE
- Khun Tan Kow Na Community Power Plant Co., Ltd. KTNP
- Khun Tan Pattana Community Power Plant Co., Ltd. KTDP
- Khun Tan Community Power Plant Co., Ltd. KTPP
- Rang Bua Kow Na Community Power Plant Co., Ltd. RBNP
- Chom Bueng Rung Rieang Community Power Plant Co., Ltd. CBRP
- Renewable Energy (Central) Co., Ltd. REC
- Knun Tan Ruam Chai Community Power Plant Co., Ltd. KTRC
- Ta Rung Rueang Community Power Plant Co., Ltd. TRRP
- Khanu Waralaksaburi Community Power Plant Co., Ltd. WLCPP
- Kamphaeng Phet Community Power Plant Co., Ltd. KACPP
- Khlong Khlung Development Community Power Plant Co., Ltd. KHLCP
- Renewable Energy (North) Co., Ltd. REN
- Buriram Ruam Chai Community Power Plant Co., Ltd. BURC
- Kamphaeng Phet Development Community Power Plant Co., Ltd. KAMD
- Renewable Energy (Northeast) Co., Ltd. RENE
- Ta Pattana Community Power Plant Co., Ltd TDPP
- Nong Hong Community Power Plant Co., Ltd. NHCP
- Ta Kow Na Community Power Plant Co., Ltd. TKNP
- Ta Community Power Plant Co., Ltd. TCPP
- Renewable Energy Siam Co., Ltd. RESM
- Khun Tan Rung Rueang Community Power Plant Co., Ltd. KTRP
- Kamphaeng Phet Kow Klai Community Power Plant Co., Ltd. KPKKC
Runs an electricity and steam generating and distributing business under the clean energy power plant from
Absolute Clean Energy Public Company Limited currently holds 23 COD power plants (total of 257.57 megawatts) and another 66 projects are being developed.
Power plant project overview
COD Projects
24 Projects
Capacity
277.57 MW
Under Development
65 projects
Capacity
>324.72 MW
Total Capacity
> 602.29 MW
Existing Projects (24 Projects)
Type | MW Installed | PPA MW | % Own | Equity MW | Location | |
---|---|---|---|---|---|---|
1. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Chonburi |
2. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Khonkaen |
3. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Surin |
4. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Nakhon Ratchasima |
5. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Roi-et |
6. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Nongkhai |
7. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Lampang |
8. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Ubonratchathani |
9. | VSPP-MSW | 6.0 MW | 4.5 MW | 100% | 6.0 | Khonkaen |
10. | SPP-Cogen | 114.35 MW | 90.0 MW | 100% | 114.35 | Chachoengsao |
11. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | kanchanaburi |
12. | VSPP-Solar Rooftop | 1.0 MW | 1.0 MW | 100% | 1.0 | Chonburi |
13. | VSPP-Solar Rooftop | 0.73 MW | 0.73 MW | 100% | 0.73 | Nakhon Ratchasima |
14. | 1 Solar Rooftop | 1.0 MW | 1.0 MW | 100% | 1.0 | Chonburi |
15. | 1 Solar Rooftop | 0.83 MW | 0.83 MW | 100% | 0.83 | Samut Sakhon |
16. | VSPP-Biomass | 7.5 MW | 6.5 MW | 100% | 7.5 | Buriram |
17. | VSPP-Biomass | 9.5 MW | 8.0 MW | 100% | 9.5 | Buriram |
18. | VSPP-Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Nakhon Ratchasima |
19. | VSPP-MSW | 6.0 MW | 4.4 MW | 100% | 6.0 | Krabi |
20. | Waste Landfill | N/A | N/A | 100% | N/A | Udonthani |
21. | 1 Solar Rooftop | 0.24 MW | 0.24 MW | 100% | 0.24 | Nakhon Ratchasima |
22. | Floating Solar | 1.515 MW | 1.515 MW | 100% | 1.515 | Nakhon Ratchasima |
23. | VSPP - Biomass | 9.9 MW | 8.0 MW | 100% | 9.9 | Kampangphet |
24 | 1 SPP - Hybrid | 20 MW | 13.31 MW | Kampangphet |
Under Development and pending for development Projects (65 Projects)
Type | MW Installed | PPA MW | Location | |
---|---|---|---|---|
27 | 1 SPP - Hybrid | 23 MW | 20 MW | Ranong |
28 | VSPP - Biomass | 9.9 MW | 8 MW | Kampangphet |
29 | VSPP - Biomass | 9.9 MW | 8 MW | Supanburi |
30 | VSPP - Biomass | 9.9 MW | 8 MW | Nakornpathom |
31 | VSPP - Biomass | 9.9 MW | 8 MW | Nakhon Ratchasima |
32 | VSPP - Biomass | 9.9 MW | 8 MW | Chonburi |
33 | VSPP - Biomass | 9.9 MW | 8 MW | Amnatcharoen |
34 | VSPP - Biomass | 9.9 MW | 8 MW | Lopburi |
35 | VSPP - Biomass | 9.9 MW | 8 MW | Pracheenburi |
36 | VSPP - Biomass | 9.9 MW | 8 MW | Srisaket |
37 | VSPP - Biomass | 9.9 MW | 8 MW | Chonburi |
38 | VSPP - MSW | 9.0 MW | 7.75 MW | Udonthani |
39 | VSPP - MSW | 9.9 MW | 8 MW | Nakhon Ratchasima |
40-57 | VSPP - Biogas | 59 MW | 50 MW | Chiangrai / Kampaengphet / Buriram / Ratchburi |
58 | Private PPA - Solar Rooftop | 9.59 MW | 9.59 MW | Phetchaburi |
59-63 | Solar Farm | >35.40 MW | 35.40 MW | { Nakhon Si Thammarat, Phitsanulok, Phichit, Khon Kaen, Nong Khai, Ranong, Ratchaburi, Sisaket, Chainat } |
64-73 | Solar Farm | >57.33 MW | 57.33 MW | |
74-76 | Solar Farm | >20.00 MW | 20.00 MW | |
77-90 | Private PPA - Solar Rooftop | 1.92 MW | 1.92 MW | { Chonburi, Khon Kaen, Nakhon Ratchasima, Surin, Roi Ed, Udonthani, Chaiyaphum, Pracheenburi, Buriram } |
91 | Private PPA - Solar Rooftop | 0.93 MW | 0.93 MW | Chonburi |